Daytime Noise Monitoring Results - Normal
weekday |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Station M6a,
Aegean Terrace |
|
|
|
|
|
|
|
|
|
|
Date |
Start Time |
End Time |
Weather |
Noise level (dB(A)), 30 min |
Major Construction Noise Source(s) Observed |
Other Noise Source(s) Observed |
Remarks |
Temp. (°C) |
Wind Speed (m/s) |
Noise Meter Model / ID |
Calibrator Model / ID |
Leq * |
L10 |
L90 |
06-Oct-11 |
10:41 |
11:11 |
Cloudy |
61 |
64 |
52 |
Mud out |
Excavation
from the construction site near Cyberport PTW
|
Free-field
measurement, +3dB correction. |
25.2 |
<5 |
B&K
2238 S/N : 2684503 |
B&K
4231 S/N: 2385180 |
18-Oct-11 |
10:51 |
11:21 |
Sunny |
56 |
57 |
52 |
Mud out |
Excavation from the construction site near Cyberport PTW
|
Free-field measurement, +3dB correction. |
24.7 |
<5 |
B&K 2238 S/N :
2684503 |
B&K 4231 S/N: 2385180 |
24-Oct-11 |
11:00 |
11:30 |
Sunny |
58 |
59 |
55 |
Works inside noise enclosure |
Excavation from the construction site near Cyberport PTW
|
Free-field measurement, +3dB correction. |
25.7 |
<5 |
B&K 2238 S/N :
2684503 |
B&K 4231 S/N: 2385180 |
00-Jan-00 |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
00-Jan-00 |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
|
|
|
Min. |
56 |
|
|
|
|
|
|
|
|
|
|
|
|
Max. |
61 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
[1] The
monitoring data was cancelled due to rain on 12 Oct |
|
|
|
|
|
|
|
|
[2] Free-field
measurement, +3dB correction. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|